|
Ajusta Pump.
OPERATING INSTRUCTIONS.
|Operating
Instructions| |Stroke
& Crank Arm Sizing Diagrams| | Stroke Sizing
Formula|
|Stroke Length
Adjustments | |Beam
Balancing Instructions| |Balancing
Formula|
|Anchoring
Instructions| |BPD
vs. Depth Curve| |SPM
to Stoke Ratios| |Parts Listing|
PLEASE READ THE FOLLOWING BEFORE SETUP OR OPERATION.
-
NOTE: To avoid damage to well
components, the sucker rods
must always be secured when adjusting any of the beams, the crank
arm or
removing weights.
As with all heavy equipment, caution should always be exercised
to avoid injury.
-
Read all instructions pertaining to motor wiring (on serial plate number) and controller wiring prior to turning on current to controller and
motor.
When motor is properly wired, the crank shaft should rotate in
a clockwise direction when viewed from the crank side of the
transmission output shaft, (see Diagram 1).
Bearings should be lightly lubricated prior to operating
Ajusta Pump.
NOTE: Do not over lubricate as this will disturb seal on
bearings.
|