Oilfield Equipment Services.
 

 

Ajusta Pump.

OPERATING INSTRUCTIONS.

|Operating Instructions| |Stroke & Crank Arm Sizing Diagrams| | Stroke Sizing Formula
 |Stroke Length Adjustments | |Beam Balancing Instructions|  |Balancing Formula|
 |Anchoring Instructions| |BPD vs. Depth Curve|  |SPM to Stoke Ratios|  |Parts Listing|


BPD vs. Depth Curve & SPM to Stroke Length Ratios.


Oil Field Equipment Services

 

 

 

Oil Field Equipment Services

Inches

SPM

5 45.8
10 32.4
15 26.4
20 22.9
25 20.5
30 18.7


Caution! On DC applications many controllers are equipped with a variable speed control,  (VSC).  Before starting motor, confirm that the VSC is set for a slow setting.  Once motor is started, adjust VSC to achieve desired SPM.  Being careful not to exceed recommended SPM for the length of stroke you are using.

Back  Next

BACK TO TOP

Home · Products · Testimonials · Newsletters·  Contact Us · Forum  
Links · Titan Pumping System · Down Stroke Pump · Paraffin Control Systems

Terms of use. Copyright © 2000 - 2004. Oilfield Equipment Services. All rights reserved.